Ronski + Burke commissioned to supervise the revitalization of an empty approx. 6000 m² 1970s nursing home

Ronski+Burke have been commissioned by a German project developer (commercial property) as architects to supervise the conversion of the approx. 6,000m² vacant former nursing home from the 1971s to a new use. Areas for working, art and culture are planned. The contract includes all necessary architectural services from the building permit to the turnkey handover. The 70s building on a hillside has particularly impressive room formations in the basements. The location next to a Kreuzberg park is a prime location.

General Planner for Refurbishment of a Residential Building

Ronski+Burke has been commissioned as a general planner to oversee the refurbishment of a turn of century residential building in Berlin-Charlottenburg. The scope of the project will include the conversion of the vacant attic into new apartments, refurbishment of existing apartments, staircases, installation of an elevator system, updating flooring, and a redesign of the façade. The contract includes project management as well as all the necessary architectural and engineering services up to the turnkey transfer.

TDD test site technical safety

RBA has been retained as advisor for the Federal Agency for Real Estate (BImA) with a contract for a Technical Due Diligence and CapEx calculation at a large test facility in a forest in the state of Brandenburg. The vast test compound of ca. 12km² comprises ca. 80 installations and test sites to be surveyed. Source: Photo BAM

Refurbishment of old building

RBA has been chosen for new tasks for Austrian investors in Berlin: a wonderful 2,500 m² old building with severe neglect and damage, spread over 35 rental units, needs to be fully renovated. Single floorslabs were collapsed.

TDD BAM-site

RBA has been chosen by the Federal Office for Building and Regional Planning for the technical due diligence of an office & science campus as a Basis for the new development (master plan). Reporting on risks and damage to the building structure, fit out and in the technical installations. Evaluation of the documents in relation to the compliance with the legal requirements and cost calc.

6 new roof apartments completed

After 1.5 years of construction: Completion of  converted attic roofs  in Prenzlauer Allee. On about 500 m², 6 new apartments, terraces and balconies with views over the rooftops of Berlin have been created.

New branch of a utility vehicle manufacturer

New contract for the construction of a new branch in Berlin. An existing building requires conversion. A well-known, German commercial vehicle manufacturer wants to build another trade port in the capital.
RBA is responsible from planning, building permit to hand over and has the taken the relevant experts (structural, fire protection and mechanical & electrical engineers) on board.

New refurbishment contract for local transport system (BVG)

Mixed use buildings in Berlin Wedding and Berlin Neukölln, which are partly residential and with operational facilities of the BVG. They are to be renovated and re-structured. The budget is ca. 2.6 million euros. The buildings from 1929 and 1938 are partially under monument protection. RBA is responsible for building / construction and M&E and commissioned as general planner.

School refurbishment

Berlin is renovating its schools. Since 2012, around 1.1 billion euros have been spent on this. In the next few years, the refurbishment and construction of new school buildings will be a priority. A primary school with 4 buildings in the district of Lichterfelde is to be modernised. RBA was asked for a fee proposal by the district office Steglitz-Zehlendorf of Berlin for a survey and cost calculation of the remediation costs.