Work in progress..

The conversion and extension of an elementary school from the 70s in Berlin Lichterfelde is taking off with the workshop with the school management and SuS (school and sports) Berlin. As soon as the space requirements have been determined, RBA will work out the conversion options, coordinate them with the district and determine the construction costs. 

Refurbishment of old building

RBA has been chosen for new tasks for Austrian investors in Berlin: a wonderful 2,500 m² old building with severe neglect and damage, spread over 35 rental units, needs to be fully renovated. Single floorslabs were collapsed.

TDD BAM-site

RBA has been chosen by the Federal Office for Building and Regional Planning for the technical due diligence of an office & science campus as a Basis for the new development (master plan). Reporting on risks and damage to the building structure, fit out and in the technical installations. Evaluation of the documents in relation to the compliance with the legal requirements and cost calc.

6 new roof apartments completed

After 1.5 years of construction: Completion of  converted attic roofs  in Prenzlauer Allee. On about 500 m², 6 new apartments, terraces and balconies with views over the rooftops of Berlin have been created.

New branch of a utility vehicle manufacturer

New contract for the construction of a new branch in Berlin. An existing building requires conversion. A well-known, German commercial vehicle manufacturer wants to build another trade port in the capital.
RBA is responsible from planning, building permit to hand over and has the taken the relevant experts (structural, fire protection and mechanical & electrical engineers) on board.

New refurbishment contract for local transport system (BVG)

Mixed use buildings in Berlin Wedding and Berlin Neukölln, which are partly residential and with operational facilities of the BVG. They are to be renovated and re-structured. The budget is ca. 2.6 million euros. The buildings from 1929 and 1938 are partially under monument protection. RBA is responsible for building / construction and M&E and commissioned as general planner.

School refurbishment

Berlin is renovating its schools. Since 2012, around 1.1 billion euros have been spent on this. In the next few years, the refurbishment and construction of new school buildings will be a priority. A primary school with 4 buildings in the district of Lichterfelde is to be modernised. RBA was asked for a fee proposal by the district office Steglitz-Zehlendorf of Berlin for a survey and cost calculation of the remediation costs.